Our factory
Inside our workshop.
The sample cabinet stands next to the machines. What you approve on a piece is what the line copies for bulk.



A single floor, six steps.
Cut, bound, washed, inspected and packed without leaving the building. That is why a colour or weight change can be answered with a sample rather than a spreadsheet.
Capacity, lead times and minimums are quoted per article. We do not publish volume claims we cannot confirm for your order.
Production
From roll to carton.
Yarn & fabric intake
Incoming rolls are checked for weight and hand feel before cutting.
Weaving & pile
Loop height and density are set per article, not per batch.
Edge binding
Binding is stitched on the same machines used for the approval sample.
Wash & set
Pieces are washed and dried to settle pile before colour review.
Inspection
Every lot is pulled for weight, colour and stitch checks before packing.
Packing & marking
Poly bags, hang tags and carton marking follow the confirmed packing list.
Inspection
What gets checked, and what is written down.
Weight per piece
Checked against the approved article sheet, not an average of the lot.
Recorded per lot
Colour match
Compared under daylight against the signed colour standard.
Approved swatch kept
Lint & pile
Wipe and shake tests on microfiber articles to catch shedding.
Checked at inspection
Stitch & edge
Binding is pulled at the corners, where most edge failures start.
Pulled per lot
Documents
Certificates and reports.
Test documents are issued for the specific article on order. Rather than publishing generic certificates, we send the report that matches your construction, colour and destination market.
Material composition
Fibre content report for the article you order, issued on request.
Available on request
Colour fastness
Wash and rub test reports for dyed articles, issued on request.
Available on request
Care labelling
Care and content text prepared to suit the destination market.
Available on request
Ask for a sample piece.
Send the article and target quantity. We confirm construction, colour and what the sample will cost before anything is cut.